detailed engineering6666是什么意思思

爱我就收藏我,管我明天是谁的新娘。
百度云一下
百度云一下
当前位置:
/ 资源详情
: 155.26KB
: baiyuefei1980
个人说明  该会员暂无个人说明
该专辑暂无相关内容描述
该专辑暂无相关内容描述
该专辑暂无相关内容描述
该专辑暂无相关内容描述
该专辑暂无相关内容描述
该专辑暂无相关内容描述
该专辑暂无相关内容描述
该专辑暂无相关内容描述
《大话刘罗锅》是由郭德纲根据传统单口相声《君臣斗》改编而来。讲的是当朝宰相刘墉与贪官和珅斗智斗勇的故事。
纸扇长,锯木方。穿大褂,站桌旁。祖师爷当下说学逗唱,洒向人间笑一场。开茶馆
临沂孙虎牌技娱乐公司 电话: 牌技 牌具
程序麻将机
该会员暂无个人说明
该会员暂无个人说明
该会员暂无个人说明
小东教程网客服Qq
该会员暂无个人说明
该会员暂无个人说明
该会员暂无个人说明
该会员暂无个人说明
该会员暂无个人说明
57百度云搜索不存储任何资源,网站资源来自57百度云蜘蛛程序对百度网盘资源的爬取,只作交流和学习使用,如有侵权和非法不良信息,请联系百度网盘举报删除,删除资源后本站收录的资源分享链接也将自动失效。如有疑问,也可联系我们。联系邮箱:
SpiderDisk For BIDU beta1.0 |
Powered By
本次执行耗时:0.006993sDETAILED ENGINEERING
PROCESS-CIVIL-MECHANICAL
ELECTRICAL-INSTRUMENTATION
THIRD PARTY INSPECTIONS
EQUIPMENTS & COMPONENTS
MECHANICAL- ELECTRICAL- INSTRUMENTATION
Recipients of many National Awards from Govt. of India for
&Excellence in Consultancy&, &Entrepreneurship& &
&Commendation Certificate& for &Quality&.
Rendering Engineering Consultancy services to Industry Sectors in
Oil & Gas, Petrochemicals, Chemicals & Allied Fields, Bulk Drugs and
Pharmaceuticals Etc.
Detailed Engineering
Project Implementation
Energy Conservation
Safety & Hazop Studies
Party Inspections
Acceptance Testsdetailed-engineering-design-phase_图文_百度文库
两大类热门资源免费畅读
续费一年阅读会员,立省24元!
detailed-engineering-design-phase
上传于||文档简介
&&d​e​t​a​i​l​e​d​-​e​n​g​i​n​e​e​r​i​n​g​-​d​e​s​i​g​n​-​p​h​a​s​e
阅读已结束,如果下载本文需要使用
想免费下载本文?
下载文档到电脑,查找使用更方便
还剩5页未读,继续阅读
你可能喜欢From Wikipedia, the free encyclopedia
Front-End Engineering (FEE), or Front-End Engineering Design (FEED), is an engineering design approach used to control project expenses and thoroughly plan a project before a fix bid quote is submitted. It may also be referred to as Pre-project planning (PPP), , feasibility analysis, or early project planning.
The FEE is basic engineering which comes after the
or . The FEE design focuses the technical requirements as well as rough investment cost for the project. The FEE can be divided into separate packages covering different portions of the project. The FEE package is used as the basis for bidding the Execution Phase Contracts (EPC, EPCI, etc) and is used as the design basis.
A good FEE will reflect all of the client's project-specific requirements and avoid significant changes during the execution phase. FEE contracts usually take around 1 year to complete for larger-sized projects. During the FEE phase there is close communication between Project Owners and Operators and the Engineering Contractor to work up the project-specific requirements.
Front-End Engineering focuses on technical requirements and identifying main costs for a proposed project. It is used to establish a price for the execution phase of the project and evaluate potential risks. It is typically followed by
(or Detailed Engineering). The amount of time invested in Front-End Engineering is higher than a traditional quote, because project specifications are thoroughly extracted and the following typically developed in detail:
Project Organization Chart
Project Scope
engineering
, safety and ergonomic studies
2D & 3D preliminary models
Equipment layout and installation plan
Engineering design package development
Major equipment list
Project timeline
Fixed-bid quote
Traditionally, all of these documents would be developed in detail during a design review after a quote has been agreed to. A company using FEE will develop these materials before submitting a quote.
Front-end engineering is typically used by design/build engineering firms. These firms may operate in various industries including:
Chemical processing
Construction
Equipment design
Process system design
Production line design
FEE Methodology: FEE is a way of looking at a project before completing detailed design. There is not set way to conduct a Front-End Engineering study. Generally, FEE requires an engineer or a group of engineers to thoroughly and logically consider a proposed project. Example considerations may include:
Degree of automation – depending on the application being considered, automation may or may not be appropriate. Determining the amount of automation in the project will help determine equipment, labor costs, layout, and design.
Rates and levels – to hit a certain rate or level of, for example, production, a certain amount of equipment, materials, and automation may be required. Determining key rates and parameters will have great effect on overall project costs and timeline
Material specifications – Not all materials work well together, or can withstand the physical application. A basic engineering discipline is determining materials of construction, material compatibility etc.
Standards and guidelines – every industry has standards and guidelines, and many industries are regulated. Any equipment, production facilities, manufacturing lines etc. developed for these industries must meet these standards and regulations and can have major impact on costs/time to project completion
Assumptions, Exclusions, and potential problems: FEE seeks to identify potential problems, assumptions or exclusions that could affect the project during execution. Identifying these during the front-end planning stage so they can be accounted for is the goal of FEE.}

我要回帖

更多关于 o2o是什么意思 的文章

更多推荐

版权声明:文章内容来源于网络,版权归原作者所有,如有侵权请点击这里与我们联系,我们将及时删除。

点击添加站长微信